08600 Procurement Packages / 08610 Employers Requirements 9 files - 7MB
08600 Procurement Packages / 08620 Collateral Warranty 1 file - 70KB
Echelon DUB10 Energy Centre - Collateral Warranty and Deed of Novation template
1
S2-Issued for Information
70 KB
08600 Procurement Packages / 08630 Mechanical Package / 08631 Specifications 15 files - 22MB
Heat Recovery Steam Generator (HRSG)
P02
D2-Issued for Tender
6 MB
Demineralised Water Storage & Forwarding System
P01
D2-Issued for Tender
195 KB
Steam Turbine Generator (STG)
P02
D2-Issued for Tender
783 KB
Air Cooled Steam Condenser (ACC)
P02
D2-Issued for Tender
663 KB
Compressed Air System
P03
D2-Issued for Tender
628 KB
Water Treatment, Chemical Feed, and Sampling System
P02
D2-Issued for Tender
1 MB
Oil Water Seperators
P02
D2-Issued for Tender
284 KB
Field Erected Tanks
P01
D2-Issued for Tender
335 KB
Fuel Oil Storage and Forwarding
P02
D2-Issued for Tender
9 MB
Mechanical Design Criteria
C01
D2-Issued for Tender
293 KB
Piping Codes
C01
D2-Issued for Tender
2 MB
Piping Installations
C01
D2-Issued for Tender
538 KB
Manual Valves
P01
D2-Issued for Tender
245 KB
Fire Protection Systems
P01
D2-Issued for Tender
335 KB
Site Specific Design Conditions
P01
D2-Issued for Tender
166 KB
08600 Procurement Packages / 08630 Mechanical Package / 08632 Schematics 30 files - 12MB
Mechanical Water Balance
P03
D2-Issued for Tender
236 KB
Mechanical Water Balance Annual Average Conditions
P02
D2-Issued for Tender
236 KB
Mechanical Heat Balance (OP-01)
P03
D2-Issued for Tender
769 KB
Mechanical Heat Balance 10C Single STG
P02
D2-Issued for Tender
780 KB
Mechanical Heat Balance (OP-02)
P03
D2-Issued for Tender
780 KB
Mechanical Heat Balance 15C Single STG
P02
D2-Issued for Tender
780 KB
Mechanical Heat Balance (OP-03)
P03
D2-Issued for Tender
780 KB
Mechanical Heat Balance 5C Single STG
P02
D2-Issued for Tender
780 KB
Mechanical Heat Balance (OP-04)
P03
D2-Issued for Tender
780 KB
Mechanical Heat Balance 30C Single STG
P02
D2-Issued for Tender
780 KB
Drawing Index
P03
D2-Issued for Tender
826 KB
P&ID Legend Abbreviations and Notes
P02
D2-Issued for Tender
297 KB
P&ID Legend Abbreviations and Notes
P01
D2-Issued for Tender
228 KB
P&ID Gas Turbine Generators
P01
D2-Issued for Tender
230 KB
P&ID Black Start Diesel Generators
P01
D2-Issued for Tender
221 KB
P&ID Demin Water
P02
D2-Issued for Tender
241 KB
P&ID Demin Water
P02
D2-Issued for Tender
218 KB
P&ID Fire Protection
P01
D2-Issued for Tender
244 KB
P&ID Fire Protection
P01
D2-Issued for Tender
243 KB
P&ID Fire Protection
P01
D2-Issued for Tender
220 KB
P&ID Compressed Air System
P03
D2-Issued for Tender
240 KB
P&ID Instrument Air
P02
D2-Issued for Tender
239 KB
P&ID Instrument Air
P02
D2-Issued for Tender
244 KB
P&ID Instrument Air
P01
D2-Issued for Tender
224 KB
P&ID Fuel Oil Truck Unloading
P03
D2-Issued for Tender
242 KB
P&ID Fuel Oil Storage
P03
D2-Issued for Tender
231 KB
P&ID Fuel Oil Forwarding
P03
D2-Issued for Tender
236 KB
P&ID Fuel Oil Distribution
P03
D2-Issued for Tender
227 KB
P&ID Plant Drains
P01
D2-Issued for Tender
228 KB
P&ID Plant Drains
P01
D2-Issued for Tender
232 KB
08600 Procurement Packages / 08630 Mechanical Package / 08634 Layout Drawings 1 file - 6MB
Site Layout
P02
D2-Issued for Tender
6 MB
08600 Procurement Packages / 08630 Mechanical Package / 08636 Fuel Oil Info 57 files - 21MB
M504 - Fuel Oil Storage and Forwarding - Early Power
P02
S3-Issued for Internal Review & Comment
9 MB
MANUAL VALVE LIST - PHASE 2
C07
S4-Issued for Construction Approval
272 KB
SPECIALTIES LIST - PHASE 1 AND 2
C07
S4-Issued for Construction Approval
132 KB
BOP INSTRUMENT LIST
P03
S3-Issued for Internal Review & Comment
102 KB
BOP INSTRUMENT LIST
P03
S3-Issued for Internal Review & Comment
132 KB
LINE LIST - PHASE 2
C07
S4-Issued for Construction Approval
205 KB
PID-0002 - PIPING AND INSTRUMENTATION DIAGRAM - LEGEND, ABBREVIATIONS AND NOTES
C02
S4-Issued for Construction Approval
300 KB
PID-0003 - PIPING AND INSTRUMENTATION DIAGRAM - LEGEND, ABBREVIATIONS AND NOTES
C01
A5 - Issued for Construction
220 KB
PID-1171 - PIPING AND INSTRUMENTATION DIAGRAM - FUEL OIL
C10
S4-Issued for Construction Approval
269 KB
PID-1172 - PIPING AND INSTRUMENTATION DIAGRAM - FUEL OIL - EARLY POWER
C06
S4-Issued for Construction Approval
265 KB
PID-1173 - PIPING AND INSTRUMENTATION DIAGRAM - FUEL OIL
C10
S4-Issued for Construction Approval
281 KB
PID-1174 - PIPING AND INSTRUMENTATION DIAGRAM - FUEL OIL
C09
S4-Issued for Construction Approval
252 KB
PID-1175 - PIPING AND INSTRUMENTATION DIAGRAM - FUEL OIL
C08
S4-Issued for Construction Approval
275 KB
PID-1176 - PIPING AND INSTRUMENTATION DIAGRAM - FUEL OIL
C05
S4-Issued for Construction Approval
269 KB
PID-1177 - PIPING AND INSTRUMENTATION DIAGRAM - FUEL OIL
C08
S4-Issued for Construction Approval
271 KB
PID-1178 - PIPING AND INSTRUMENTATION DIAGRAM - FUEL OIL
C08
S4-Issued for Construction Approval
254 KB
PID-1179 - PIPING AND INSTRUMENTATION DIAGRAM - FUEL OIL
C08
S4-Issued for Construction Approval
263 KB
M001 - PIPING CODES
C02
S4-Issued for Construction Approval
2 MB
M002 - PIPING INSTALLATION
P02
S3-Issued for Internal Review & Comment
442 KB
M003 - PIPING AND EQUIPMENT INSULATION
P01
S3-Issued for Internal Review & Comment
392 KB
M007 - MANUAL VALVES
C01
A5 - Issued for Construction
308 KB
M011 - CONTROL VALVES
C01
A5 - Issued for Construction
1 MB
M012 - PIPING SPECIALTIES
P01
S3-Issued for Internal Review & Comment
429 KB
PG-17305 - PRESSURE GAUGES - FUEL OIL FWD PUMP 2 OUTLET PRESS
P01
S3-Issued for Internal Review & Comment
105 KB
PG-17306 - PRESSURE GAUGES - FUEL OIL FWD PUMP 3 INLET PRESS
P01
S3-Issued for Internal Review & Comment
105 KB
PG-17307 - PRESSURE GAUGES - FUEL OIL FWD PUMP 3 OUTLET PRESS
P01
S3-Issued for Internal Review & Comment
105 KB
PT-17308 - PRESSURE TRANSMITTER - FUEL OIL FWD PUMPS DISCH PRESS
P01
S3-Issued for Internal Review & Comment
105 KB
PT-17309 - PRESSURE TRANSMITTER - FUEL OIL FWD PUMPS STRAINER OUTLET PRESS
P01
S3-Issued for Internal Review & Comment
104 KB
PT-17312 - PRESSURE TRANSMITTER - FUEL OIL FWD PUMPS RECIRC PRESS A
P01
S3-Issued for Internal Review & Comment
104 KB
PT-17313 - PRESSURE TRANSMITTER - FUEL OIL FWD PUMPS RECIRC PRESS B
P01
S3-Issued for Internal Review & Comment
104 KB
PT-17314 - PRESSURE TRANSMITTER - FUEL OIL FWD PUMPS RECIRC PRESS C
P01
S3-Issued for Internal Review & Comment
104 KB
TEMPERATURE TRANSMITTERS - FUEL OIL TANK
P02
S3-Issued for Internal Review & Comment
136 KB
TT-17202 - TEMPERATURE TRANSMITTER - FUEL OIL TK-EP02 TEMP
P01
S3-Issued for Internal Review & Comment
105 KB
TT-17203 - TEMPERATURE TRANSMITTER - FUEL OIL TK-EP03 TEMP
P01
S3-Issued for Internal Review & Comment
105 KB
FT-17105 - TURBINE FLOWMETERS - FUEL OIL UNLOADING FLOW
P01
S3-Issued for Internal Review & Comment
119 KB
TURBINE FLOWMETERS - FUEL OIL FWD PUMPS FLOW
P02
S3-Issued for Internal Review & Comment
85 KB
LEVEL TRANSMITTERS - DIFF PRESS - FUEL OIL TK LEVEL
P02
S3-Issued for Internal Review & Comment
133 KB
LT-17202 - LEVEL TRANSMITTERS - DIFF PRESS - FUEL OIL TK-EP02 LEVEL
P01
S3-Issued for Internal Review & Comment
104 KB
LT-17203 - LEVEL TRANSMITTERS - DIFF PRESS - FUEL OIL TK-EP03 LEVEL
P01
S3-Issued for Internal Review & Comment
104 KB
PDT-17101 - PRESSURE TRANSMITTERS = FUEL OIL UNLOADING PUMPS SUCTION STRAINER DP
P01
S3-Issued for Internal Review & Comment
105 KB
PG-17106 - PRESSURE GAUGES - FUEL OIL UNLOADING PUMP 1 DISCH PRESS
P01
S3-Issued for Internal Review & Comment
105 KB
PG-17107 - PRESSURE GAUGES - FUEL OIL UNLOADING PUMP 2 DISCH PRESS
P01
S3-Issued for Internal Review & Comment
105 KB
PG-17112 - PRESSURE GAUGES - FUEL OIL UNLOADING PUMP 1 SUCTION PRESS
P01
S3-Issued for Internal Review & Comment
105 KB
PG-17113 - PRESSURE GAUGES - FUEL OIL UNLOADING PUMP 2 SUCTION PRESS
P01
S3-Issued for Internal Review & Comment
105 KB
PG-17302 - PRESSURE GAUGES - FUEL OIL FWD PUMP 1 INLET PRESS
P01
S3-Issued for Internal Review & Comment
105 KB
PG-17303 - PRESSURE GAUGES - FUEL OIL FWD PUMP 1 OUTLET PRESS
P01
S3-Issued for Internal Review & Comment
105 KB
PG-17304 - PRESSURE GAUGES - FUEL OIL FWD PUMP 2 INLET PRESS
P01
S3-Issued for Internal Review & Comment
105 KB
LEVEL TRANSMITTERS - DIFF PRESS - FUEL OIL TK LEVEL SW
P01
S3-Issued for Internal Review & Comment
133 KB
LEVEL TRANSMITTERS - FUEL OIL TK LEVEL
P04
S4-Issued for Construction Approval
128 KB
LEVEL TRANSMITTERS - DIFFERENTIAL PRESSURE - FUEL OIL TANK LEAK DETECTION
P01
S3-Issued for Internal Review & Comment
133 KB
TEMPERATURE TRANSMITTERS - FUEL OIL
P01
S3-Issued for Internal Review & Comment
137 KB
CONTROL VALVE DATASHEET - FUEL OIL FORWARDING
C01
A5 - Issued for Construction
146 KB
CONTROL VALVE DATASHEET - FUEL OIL SUPPLY
C01
A5 - Issued for Construction
146 KB
CONTROL VALVE DATASHEET - FUEL OIL RETURN
C01
A5 - Issued for Construction
147 KB
CONTROL VALVE DATASHEET - FUEL OIL FORWARDING TO BSDG
C01
A5 - Issued for Construction
146 KB
CONTROL VALVE DATASHEET - FUEL OIL RECIRCULATION
C01
A5 - Issued for Construction
148 KB
CONTROL VALVE DATASHEET - FUEL OIL RECIRCULATION
C01
A5 - Issued for Construction
147 KB
08600 Procurement Packages / 08640 Electrical Package / 08641 Specifications 12 files - 9MB
MV Switchgear Specification
P01
D2-Issued for Tender
1 MB
Step Up Transformer
P04
D2-Issued for Tender
3 MB
Diesel Generator
P02
D2-Issued for Tender
916 KB
LV Switchgear
P01
D2-Issued for Tender
839 KB
Early Power Auxillary Transformer
P01
D2-Issued for Tender
1 MB
Cable Specification
P01
D2-Issued for Tender
170 KB
Cathodic Protection
P01
D2-Issued for Tender
325 KB
Lightning Protection
P01
D2-Issued for Tender
189 KB
Electrical Design Criteria
C01
D2-Issued for Tender
400 KB
Instrumentation Design Criteria
P01
D2-Issued for Tender
212 KB
Grounding and Bonding
P01
D2-Issued for Tender
160 KB
Temporary Diesel Generator
P02
D2-Issued for Tender
426 KB
08600 Procurement Packages / 08640 Electrical Package / 08642 Schematics 4 files - 2MB
Permanent Power MV Schematic
P01
D2-Issued for Tender
374 KB
Control System Block Diagram
P01
D2-Issued for Tender
341 KB
Early Power MV Schematic
P01
D2-Issued for Tender
448 KB
Early Power LV Schematic
P02
D2-Issued for Tender
449 KB
08600 Procurement Packages / 08640 Electrical Package / 08643 Equipment Schedules 1 file - 146KB
Cable Schedule
P01
D2-Issued for Tender
146 KB
08600 Procurement Packages / 08640 Electrical Package / 08644 Layout Drawings 1 file - 5MB
Site Layout
P04
S2-Issued for Information
5 MB
08600 Procurement Packages / 08640 Electrical Package / 08644 Layout Drawings / 08644.1 Earthing Drawings 14 files - 28MB
ELECTRICAL GROUNDING STANDARD DETAILS
P01
D2-Issued for Tender
720 KB
ELECTRICAL GROUNDING CADWELD CONNECTION DETAILS
P01
D2-Issued for Tender
453 KB
ELECTRICAL GROUNDING BURNDY CONNECTION DETAILS
P01
D2-Issued for Tender
588 KB
ELECTRICAL GROUNDING EQUIPMENT GROUND DETAILS
P01
D2-Issued for Tender
586 KB
ELECTRICAL GROUNDING STRUCTURE GROUND DETAILS
P01
D2-Issued for Tender
485 KB
ELECTRICAL GROUNDING MISCELLANEOUS GROUND DETAILS
P01
D2-Issued for Tender
606 KB
ELECTRICAL GROUNDING DRAWING INDEX
P01
D2-Issued for Tender
667 KB
ELECTRICAL GROUNDING ENLARGED AREA PLAN
P01
D2-Issued for Tender
4 MB
ELECTRICAL GROUNDING ENLARGED AREA PLAN
P01
D2-Issued for Tender
786 KB
ELECTRICAL GROUNDING ENLARGED AREA PLAN
P01
D2-Issued for Tender
3 MB
ELECTRICAL GROUNDING ENLARGED AREA PLAN
P01
D2-Issued for Tender
452 KB
ELECTRICAL GROUNDING OVERALL SITE PLAN
P01
D2-Issued for Tender
11 MB
ELECTRICAL GROUNDING ENLARGED AREA PLAN
P01
D2-Issued for Tender
3 MB
ELECTRICAL GROUNDING ENLARGED AREA PLAN
P01
D2-Issued for Tender
3 MB
08600 Procurement Packages / 08640 Electrical Package / 08645 LV Package (Permanent) 25 files - 16MB
01IRE002 - DB Pricing Schedule
1
S2-Issued for Information
39 KB
Building 14 - General Layouts
1
D2-Issued for Tender
751 KB
Building 14 - Elevation Plans
1
D2-Issued for Tender
707 KB
IEC Switchboard Specification
C1
D2-Issued for Tender
998 KB
Ring A LV MDB
1
D2-Issued for Tender
617 KB
RING B LV MDB
C1
D2-Issued for Tender
607 KB
RING C LV MDB
C1
D2-Issued for Tender
590 KB
STEAM TURBINE
C1
D2-Issued for Tender
589 KB
STEAM TURBINE
C1
D2-Issued for Tender
589 KB
WATER TREATMENT PLANT A
C1
D2-Issued for Tender
582 KB
WATER TREATMENT PLANT B
C1
D2-Issued for Tender
582 KB
FUEL OIL AREA MDB
C1
D2-Issued for Tender
590 KB
RING A GENERATORS AUX POWER MDB
C1
D2-Issued for Tender
593 KB
RING B GENERATORS AUX POWER MDB
C1
D2-Issued for Tender
593 KB
RING C GENERATORS AUX POWER MDB
C1
D2-Issued for Tender
573 KB
Echelon DUB10 Energy Centre - Collateral Warranty and Deed of Novation template
1
S2-Issued for Information
70 KB
08600 Procurement Packages / 08640 Electrical Package / 08646 B14 Lighting 8 files - 3MB
1
D1-Issued for Costing
20 KB
1
D1-Issued for Costing
250 KB
1
D1-Issued for Costing
895 KB